Waterman Water Treatment Plant Ozone System Improvements
This Project includes, but is not limited to, furnishing and installing the following: new liquid oxygen storage and vaporization equipment, new ozone generation equipment; cooling water equipment; piping, valving, and instrumentation; electrical equipment; and controls. All equipment shall be installed in accordance with the manufacturer's requirements and recommendations. A more detailed summary of the Project is included in Section 01110 (Summary of Work). The Contract includes any other work as shown on the Project Plans (or “Drawings”), as specified in the Contract Documents, and as directed by the City Engineer. Note: All construction work will actually occur within the Waterman Water Treatment Plant.
Status
Bidding Closed
Prebid Date | 2/8/22 10:00am |
Bid Date | 3/22/22 2:00pm |
Company & Contacts
City of Fairfield, CA
David Vong
707-428-7485
Location
Fairfield, CA
A mandatory pre‐bid meeting for prospective bidders of the project will be conducted by the OWNER at 10:00 AM on February 8, 2022. The meeting will be located at 5110 Waterworks Lane, Fairfield, CA 94533.