Waterman Water Treatment Plant Ozone System Improvements
This Project includes, but is not limited to, furnishing and installing the following: new liquid oxygen storage and vaporization equipment, new ozone generation equipment; cooling water equipment; piping, valving, and instrumentation; electrical equipment; and controls. All equipment shall be installed in accordance with the manufacturer's requirements and recommendations. A more detailed summary of the Project is included in Section 01110 (Summary of Work). The Contract includes any other work as shown on the Project Plans (or “Drawings”), as specified in the Contract Documents, and as directed by the City Engineer. Note: All construction work will actually occur within the Waterman Water Treatment Plant.
Addendum 1
(click to expand/collapse)

Name | Size | |||
Waterman WTP Ozone System Improvements Addendum 1 | 338.8 KB |
Addendum 2
(click to expand/collapse)

Name | Size | |||
Waterman WTP Ozone System Improvements Addendum 2 | 829.8 KB |
Addendum 3
(click to expand/collapse)

Name | Size | |||
Waterman WTP Ozone System Improvements Addendum 3 | 16.3 MB |