CDBG Downtown Sidewalk Gap Closure
This Project includes, but is not limited to, installation of new concrete sidewalks, ADA curb ramps and driveway aprons to close the gaps in sidewalk and all other works as shown on the contract documents.
Plans
(click to expand/collapse)
Name | Size | ||
Final CDBG DT SW GAP CLOSURE Plans | 6.0 MB |