CDBG Downtown Sidewalk Gap Closure
This Project includes, but is not limited to, installation of new concrete sidewalks, ADA curb ramps and driveway aprons to close the gaps in sidewalk and all other works as shown on the contract documents.
Status
Bidding Closed
Bid Date1/10/22 2:15pm
Company & Contacts
City of Fairfield, CA
David Vong
707-428-7784
Location
Fairfield, CA