North Bay Regional Water Treatment Plant Chiller Replacement for O-Zone Generator
Removal and replacement of the existing 40-ton chiller at the North Bay regional Water Treatment Plant, 5110 Waterworks Lane, Fairfield, California with a Carrier 30RAP 060 Nominal 60 Ton Chiller or equal. CONTRACTOR is responsible for recycling/disposing of the existing chiller at CONTRACTOR’s cost.
Addendum 1
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | |||
| Addendum 1- Chiller Replacement Project | 360.4 KB |

