SID Dally Canal Unit South Improvement Project CPW070108
General Work Description: The Project is located on Vanden Road in the City of Fairfield, CA. The work to be performed consists of the following; the removal of an existing portion of concrete canal and replacing the portion with a 36” PVC pipe, installing steel casing for a portion of the PVC pipe, and all other work shown in the Contract documents.
Specifications
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| SPEC BOOK - SID DALLY CANAL PROJECT | 3.1 MB |

