North Bay Regional Water Treatment Plant Chiller Replacement for O-Zone Generator

Removal and replacement of the existing 40-ton chiller at the North Bay regional Water Treatment Plant, 5110 Waterworks Lane, Fairfield, California with a Carrier 30RAP 060 Nominal 60 Ton Chiller or equal. CONTRACTOR is responsible for recycling/disposing of the existing chiller at CONTRACTOR’s cost.
Plans (click to expand/collapse)
Name Size
PLANS_CHILLER_PROJECT 14.0 MB