CDBG Lee Bell Park and Sidewalk Gap Closure Project

General Work Description: The work under this contract is located in Lee Bell Park and the downtown neighborhood of Fairfield, California. The work to be performed consists, in general, the installation of new concrete sidewalks to close the gaps in sidewalk, concrete pathway, and all other works as shown on the contract documents.
Specifications (click to expand/collapse)