HOF Downtown Texas Streetscape Improvement Project - Phase One Demolition

General Work Description: The scope of work includes, but is not limited to, the demolition and removal of existing pergola structures, concrete benches, brick pavers, bike racks, potted plants, and vegetation as shown on the project plans. Existing irrigation lines shall be capped below grade, and existing electrical lines shall be capped and buried below grade. Decomposed granite shall be placed to address all voids resulting from the removal of existing concrete structures.

Status

Bidding Closed

Bid Date 1/23/24 2:00pm

Company & Contacts

City of Fairfield, CA
Pavan Prasad  
707-428-7485

Location

Fairfield, CA

Documents

The Engineer’s Estimate for this project is $270,000.