Waterman Water Treatment Plant Ozone System Improvements

This Project includes, but is not limited to, furnishing and installing the following:  new  liquid  oxygen  storage  and  vaporization  equipment,  new  ozone  generation  equipment; cooling water equipment; piping, valving, and instrumentation; electrical equipment; and controls. All equipment shall be installed in accordance with the manufacturer's requirements and  recommendations.  A  more  detailed  summary  of  the  Project  is  included  in  Section  01110  (Summary of Work). The Contract includes any other work as shown on the Project Plans (or “Drawings”), as specified in the Contract Documents, and as directed by the City Engineer. Note: All construction work will actually occur within the Waterman Water Treatment Plant.

Status

Bidding Closed

Prebid Date2/8/22 10:00am

Bid Date3/22/22 2:00pm

Company & Contacts

City of Fairfield, CA
David Vong  
707-428-7485

Location

Fairfield, CA

A mandatory pre‐bid meeting for prospective bidders of the project will be conducted by the OWNER at 10:00 AM on February 8, 2022. The meeting will be located at 5110 Waterworks Lane, Fairfield, CA 94533.