Nelson Hill Reservoir Mixing and Valve Replacement Project

This Project includes, but is not limited to, replacing existingvalves at the Nelson Hill Bypass Vault, the transmission main isolation valve, the Inlet/Outlet Valve Cluster, the Altitude Valve and Flow Meter Vault, and the Reservoir Inlet and Outlet valve. In addition, the City would like to incorporate a mixing system withineach basin in the Nelson Hill Reservoir. All equipment shall be installed in accordance with the manufacturer's requirements and recommendations. The Contract includes anyother work as shown on the Project Plans, as specified in the Contract Documents, and as directed by the City Engineer.
Plans (click to expand/collapse)
Name Size
Final_NHR - Plans 24x36 17.2 MB