B Gale Wilson Blvd Bus Stops Project

The work consists of constructing two new bus stops whichincludes but is not limited to the sawcutting of existing asphalt concrete pavement andPortland Cement Concrete(PCC) sidewalks and their removal for constructing new flattercross slope sidewalks, new bus stop PCC standing area pads and bus pads, and theremoval of turf/soil and any tree roots for the new excavated concrete/aggregate baserock sections for the new standing area pads, modifications of irrigation systems and re-establishment of new matching sod turf and new asphalt concrete patches around newconcrete bus pads
No files available