NBR WTP Filter Media Replacement 2020
Removal and replacement of the sand and granular activated carbon media in Filter Bay No. 7, one of eight(8) two-bay filters at the North Bay Regional Water Treatment Plant, 5110 Water Works Lane, Fairfield, California. The CITY intends to replace one filter bay each year there after,at a sequence and specified time prescribed by the CITY. CONTRACTOR is responsible for disposal of the existing media at CONTRACTOR’S cost. CONTRACTOR shall replace any damaged nozzles, replacement nozzles installed by the CONTRACTOR will be provided by the CITY. The CITY will determine which nozzles are damaged for the CONTRACTOR to replace. CONTRACTOR is responsible for disposal of all damaged nozzles at CONTRACTOR’S cost.
Status
Bidding Closed
Bid Date5/19/20 2:00pm
Company & Contacts
City of Fairfield, CA
Michael Hether
mhether@fairfield.ca.gov
Location
Fairfield, CA
Bid Guaranty and Bonding Requirements are as follows: (a) a bid guarantee in the amountof 10% of the bid price must be submitted with bid proposal, (b) the successful bidder shallfurnish a payment bond and a performance bond in the amount of100% of total bid price.